Towers School & Sixth Form College

The motto that Towers School & Sixth Form College hold to is “excellence in everything”. They boast that everyone entering the school attains to this motto through focused leadership, a passionate approach and maintenance of top quality facilities.

Trovex contributed to the success of Towers School and Sixth Form College by transforming the washroom facilities in a very short time frame.

The X5:80 cubicle system was specified enhancing privacy while ensuring stunning looks.

The decision was made to pre-hang the duct panels on timber frames prior to delivery to site to make the installation process effortless for the contractor. Due to the volume and weight of duct framing included in eight washroom areas, the frames were strapped to pallets and split across three 7.5t trucks, making loading and offloading extremely easy with forklifts and pallet trucks.

Corian washstation tops were specified giving a hardwearing alternative to postformed high-pressure laminate tops, and again, enhancing the prestigious feel of the X5:80 system.

Products Used

Find out more about the Trovex products used in this case study:

I love the Trovex systems and service, the installation was effortless. If we had gone with any other manufacturer we would still be there!

Adam Petley, C E Sprinks & Sons Builders

How can we help you?

01707 254 170